• Globe Online Store
    Factory-Direct Deal

>> >> >> >> >> 15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap
15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap

15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap

  1. (Be the first to write a review)
  • Item number:
  • a13110400ux0705
  • Price: $23.07
  • 18in stock

    You can order at maximum the number of units in stock.
  • Free Shipping ( Wholesale Volume Discount )
  1. Product Desicription
  2. Shipping & Delivery
  3. Returns & Refund

Specification:

Product Name Battery Case
Material Plastic, Metal
Total Size 114 x 61 x 19mm/4.5" x 2.4"  x 0.75"(L*W*H)
Cable Length( Each ) 15cm/5.9"
Battery Type for 6 x 1.5V AA Battery(Not included here)
Color Black
Weight 42g
Package Content 1 x Battery Case Holder w Cover

Description:

  • This battery box holder with wire connector, fit for 6 x 1.5 V AA batteries.
  • Battery is not included here.
Note: Please do not separate, maintain, or refit the product.The wires are thin, and the structure of this product is only fit for very small current load, DO NOT connect it to a load that will cause large current, stop using this product if the wires are hot.
1. When the battery case is working, the maximum power should be less than 15W, the working current should be less than 2A.
2.Please pay attention to your battery heat generation while using this product and do not use the poor quality battery.

MPNDoes Not Apply
BrandUxcell
Customer Reviews
  • Average Customer Review (0 customer reviews)
  • 5
  • Write Review
  1. (0)
  1. (0)
  1. (0)
  1. (0)
  1. (0)
1.Tell us what you think about this item.Write a comment on this product and share your opinion with other people.Please make sure that your review focus on this item.
2.You can earn reward points when you login in and write a review.
3.Your review will become effective within 24 hours.
Write a review for 15cm Long Leads Battery Holder Box Case for 6x1.5V AA Batteries w Cap
  • Rating:
  1. NOTE:
  2. HTML is not translated!
Your View History
You have not viewed any products, let's go now!
close
Copyright © 2006-2026 SourcingMap Ltd. All Rights Reserved.