• Globe Online Store
    Factory-Direct Deal

  • Sign In / Register
  • |
  • Currencies:
    USD
    1. USDUS Dollar
    2. EUREuro
    3. GBPGBP
    4. AUDAUD
  • |
  • FAQs
  • |
  • Hotlines
  • Hotlines:
  • 1800 741-1388(US)
  • /
  • +86 755 29620083
live chat
>> MC-52 33cm Long Lead 10W DC100V NO Metal Rolling Gate Door Safety Alarm Magnetic Reed Switch Set
MC-52 33cm Long Lead 10W DC100V NO Metal Rolling Gate Door Safety Alarm Magnetic Reed Switch Set

MC-52 33cm Long Lead 10W DC100V NO Metal Rolling Gate Door Safety Alarm Magnetic Reed Switch Set

  1. (Be the first to write a review)
  • Item number:
  • a14051500ux0629
  • Price: $9.48
  • Sold Out
  • Free Shipping ( Wholesale Volume Discount )
  1. Product Desicription
  2. Shipping & Delivery
  3. Returns & Refund

Specification:

Product Name Door Magnetic Switch
Model MC-52
Color Silver Tone
Fitness Wooden Door, Glazed Door Window
Switch Type NO
Operating Distance 30-40mm
Rated Current 500mA
Rated Power 10W
Voltage 100V
Size

47 x 20 x 10mm 1.9" x 0.8" x 0.4"(L*W*H)

Mounting Hole Dia. 4mm/ 0.16"
Cable Length 33cm / 13"
Material (external) Metal
Weight 109g
Package Content

1Set Door Magnetic Switch

Description:

  • Special use for metal doors, anti-magnetic interference design.
  • Simple and convenient for installation, power-saving design.
  • The metals electroplates outer shell, double-loop circuit design, performance stable.
  • Switch Type: NO(normal open type), contact will be closed when the sensor is far way from the magnetic.
Customer Reviews
  • Average Customer Review (0 customer reviews)
  • 5
  • Write Review
  1. (0)
  1. (0)
  1. (0)
  1. (0)
  1. (0)
1.Tell us what you think about this item.Write a comment on this product and share your opinion with other people.Please make sure that your review focus on this item.
2.You can earn reward points when you login in and write a review.
3.Your review will become effective within 24 hours.
Write a review for MC-52 33cm Long Lead 10W DC100V NO Metal Rolling Gate Door Safety Alarm Magnetic Reed Switch Set
  • Rating:
  1. NOTE:
  2. HTML is not translated!
Your View History
You have not viewed any products, let's go now!
close
Copyright © 2006-2018 SourcingMap Ltd. All Rights Reserved.