• Globe Online Store
    Factory-Direct Deal

  • Sign In / Register
  • |
  • Currencies:
    USD
    1. USDUS Dollar
    2. EUREuro
    3. GBPGBP
    4. AUDAUD
  • |
  • FAQs
  • |
  • Hotlines
  • Hotlines:
  • 1800 741-1388(US)
  • /
  • +86 755 29620083
live chat
>> >> >> >> >> 15.7" Long 3 Lead Wires Air Conditioning Compressor Cable
15.7" Long 3 Lead Wires Air Conditioning Compressor Cable

15.7" Long 3 Lead Wires Air Conditioning Compressor Cable

  1. (Be the first to write a review)
  • Item number:
  • a12090300ux0855
  • Price: $4.85
  • Sold Out
  • Free Shipping ( Wholesale Volume Discount )
  1. Product Desicription
  2. Shipping & Delivery
  3. Returns & Refund

Specifications:

Product  Name Air Conditioning Compressor Cable
Main Color White
Cable Length 40cm/ 15.7"
Material Plastic, Nylon
Weight

46g

Package Content 1 x Air Conditioning Compressor Cable

Descriptions:

  • Features: 15.7" long with 3 connectors in each end, 3 lead wire. Used for air conditioner.
  • Great choice for replacing the old or broken one.

 

Customer Reviews
  • Average Customer Review (0 customer reviews)
  • 5
  • Write Review
  1. (0)
  1. (0)
  1. (0)
  1. (0)
  1. (0)
1.Tell us what you think about this item.Write a comment on this product and share your opinion with other people.Please make sure that your review focus on this item.
2.You can earn reward points when you login in and write a review.
3.Your review will become effective within 24 hours.
Write a review for 15.7" Long 3 Lead Wires Air Conditioning Compressor Cable
  • Rating:
  1. NOTE:
  2. HTML is not translated!
Your View History
You have not viewed any products, let's go now!
close
Copyright © 2006-2018 SourcingMap Ltd. All Rights Reserved.